ZJ SolutionsChallenge:
Standard General Contracting is a major Alberta-based land developer who came to us needing a travelling tripper and recovery tunnel system that included a double-boomed linear stacker.

We were faced with several engineering and construction challenges, working with a limited design during the fabrication stage. The pipes were laid out in a pyramid and sloped in so construction provided us with its own issue.

Solution:
Our expert team creatively worked through the various fabrication and construction challenges to set up an effective solution that met with Standard General’s needs. We had the stacker pile aggregate over two reclaim tunnels before being sent to a surge bin prior to a railcar load out.

Our construction of Standard General’s train load out system proved to be a tremendous success and demonstrated our ability to meet problematic fabrication challenges head on.

Back to Top

Newsletter Signup

Yes, please keep me current with leading edge industry news and Mainland Machinery updates.