Project Description
This project required that we build a single-line container trans-shipping system for P&H. This included the foundations, structural steel, loading shoot, all spouting, and the dust control system.
After installation, production increased to 235MT/hour. It incorporated two 50T loading bins and also allowed the client to load 20’ or 45’ containers on the same line.
Let’s Get Started
Learn how we can help your next project succeed.
Comments are closed.